I-80: Width limit in effect, road construction, roadway reduced to two lane. Width limit 12'0".
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0".
I-80: Road construction, roadway reduced to two lane, traffic restrictions in force.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force.
I-80 eastbound: Width limit in effect, due to road construction work. Width limit 11'0".
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect due to road construction work. Width limit 11'0". Until April 1, 2021 at about 11:59PM MST.
I-80: Width limit in effect.
Between Exit 199: NE 56D Link; Brady and Exit 222: NE 21; Cozad (North Platte). There is a width limit in effect. Until March 31, 2021 at about 11:00PM CST.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-80
Map of Reports on I-80 Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0". Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force. Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect due to road construction work. Width limit 11'0". Until April 1, 2021 at about 11:59PM MST. Between Exit 107: NE 25B Link; Big Springs and Exit 102: I-76; North 14th Street; Sidney (Ogallala). The left lane is closed due to road construction work. Between Exit 199: NE 56D Link; Brady and Exit 211: NE 47; Gothenburg (North Platte). Road maintenance work is in progress. Width limit 12'0". Until March 31, 2021 at about 5:00PM CST. Between Exit 199: NE 56D Link; Brady and Exit 222: NE 21; Cozad (North Platte). There is a width limit in effect. Until March 31, 2021 at about 11:00PM CST. Between Exit 257: US 183; Holdrege;Elm Creek and Exit 300: NE 40D Spur; NE 11; Wood River (Kearney). There is work on the shoulder because of road maintenance activities. Until today at about 10:00PM CST. Between Exit 451: 42nd Street and Exit 453: US 75; South 24th Street (Omaha). Road construction work is in progress.
I-80: Width limit in effect, road construction, roadway reduced to two lane. Width limit 12'0".
I-80: Road construction, roadway reduced to two lane, traffic restrictions in force.
I-80 eastbound: Width limit in effect, due to road construction work. Width limit 11'0".
I-80: Width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction