NDOR Logo
US 283
US 283 in both directions: Width limit in effect, due to road construction work. Width limit 12'0".
Between NE 23 and Johnson Lake Drive 24 (Elwood). There is a width limit in effect due to road construction work. Width limit 12'0". Until January 31, 2020 at about 5:00PM CST.
US 283 in both directions: Width limit in effect, due to road construction work, look out for flagger. Width limit 12'0".
Between Road 748 (6 miles north of Elwood) and West River Road (1 mile south of Lexington). There is a width limit in effect due to road construction work. Look out for flaggers. Width limit 12'0". Until Friday, at about 5:00PM CST.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 283
Map of Reports on US 283 Between NE 23 and Johnson Lake Drive 24 (Elwood). There is a width limit in effect due to road construction work. Width limit 12'0". Until January 31, 2020 at about 5:00PM CST. Between NE 23 and Johnson Lake Drive 24 (Elwood). There is a width limit in effect due to road construction work. Width limit 12'0". Until January 31, 2020 at about 5:00PM CST. Between Road 748 (6 miles north of Elwood) and West River Road (1 mile south of Lexington). There is a width limit in effect due to road construction work. Look out for flaggers. Width limit 12'0". Until Friday, at about 5:00PM CST.
US 283 in both directions: Width limit in effect, due to road construction work. Width limit 12'0".
US 283 in both directions: Width limit in effect, due to road construction work, look out for flagger. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction