Truck Restrictions on I-80
I-80
Between Wyoming State Line and Exit 20: NE 71; Kimball (Pine Bluffs). There is a width limit in effect. Road construction work is in progress. Width limit 12'0".
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0".
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. The roadway is reduced to one lane. The roadway is shared with opposing traffic due to road construction work. Width limit 10'0". Until October 1, 2020 at about 5:00PM MDT.
Between Exit 190: NE 56A Spur; Maxwell and Exit 199: NE 56D Link; Brady (14 miles east of North Platte). Traffic restrictions are in force.
Between Exit 190: NE 56A Spur; Maxwell and Exit 199: NE 56D Link; Brady (15 miles east of North Platte). Traffic restrictions are in force.
Between Exit 353: US 81; York;Geneva and Exit 369: NE 80E Link; Beaver Crossing (York). There is a width limit in effect due to road construction work. Width limit 12'0". Until December 1, 2020 at about 5:00PM CDT.
Between Exit 426: NE 66; Mahoney State Park; Ashland; South Bend and Exit 432: NE 31; Gretna;Louisville (Omaha). There is a width limit in effect. The left lane is closed. The center lane is closed due to road construction work. Width limit 12'0". Until November 30, 2020 at about 5:00PM CDT.