NDOR Logo
US 83
US 83 in both directions: Road construction, width limit in effect.
Between NE 2 (64 miles north of North Platte) and Brownlee Road (56 miles south of Valentine). Road construction work is in progress. There is a width limit in effect.
US 83 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, look out for flagger, pilot car in operation. Width limit 12'0".
Between NE 2 and Brownlee Road (Valentine). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 1, 2020 at about 5:00PM CDT.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 83
Map of Reports on US 83 Between East 11th Street and NE 23 (McCook). The roadway is reduced to one lane because of road maintenance activities. Look out for flaggers. A pilot car is in operation. Between Red Willow Dam Road and NE 23 (McCook). The roadway is reduced to one lane due to road construction work. Look out for flaggers. Between Red Willow Dam Road and NE 23 (McCook). The roadway is reduced to one lane due to road construction work. Look out for flaggers. Between NE 2 (64 miles north of North Platte) and Brownlee Road (56 miles south of Valentine). Road construction work is in progress. There is a width limit in effect. Between NE 2 and Brownlee Road (Valentine). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 1, 2020 at about 5:00PM CDT.
US 83 in both directions: Road construction, width limit in effect.
US 83 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, look out for flagger, pilot car in operation. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction