NDOR Logo
Check out our new 511 website and leave us feedback!.
NE 21
NE 21 in both directions: Width limit in effect, road construction, temporary traffic light, bridge construction. Width limit 11'0". Speed limit 35 MPH.
Between NE 23 and Johansen Drive (Cozad). There is a width limit in effect. Road construction work is in progress. Look out for temporary traffic lights. Bridge construction work is in progress. Width limit 11'0". Speed limit 35 MPH. Until October 15, 2021 at about 5:00PM CDT.
NE 21 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, look out for flagger, temporary traffic light, bridge construction. Speed limit 35 MPH. Width limit 11'0".
Between Sunset Drive and Road 771 (Lexington). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Look out for temporary traffic lights. Bridge construction work is in progress. Speed limit 35 MPH. Width limit 11'0". Until August 31, 2021 at about 5:00PM CDT.
NE 21 in both directions: Width limit in effect, temporary traffic light, roadway reduced to one lane, due to road construction work, look out for flagger, pilot car in operation. Width limit 12'0".
Between Road 774 and Old Highway 21 (Oconto). There is a width limit in effect. Look out for temporary traffic lights. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until September 1, 2021 at about 11:59PM CDT.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on NE 21
Map of Reports on NE 21 Between NE 23 and Johansen Drive (Cozad). There is a width limit in effect. Road construction work is in progress. Look out for temporary traffic lights. Bridge construction work is in progress. Width limit 11'0". Speed limit 35 MPH. Until October 15, 2021 at about 5:00PM CDT. Between Sunset Drive and Road 771 (Lexington). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Look out for temporary traffic lights. Bridge construction work is in progress. Speed limit 35 MPH. Width limit 11'0". Until August 31, 2021 at about 5:00PM CDT. Between Road 774 and Old Highway 21 (Oconto). There is a width limit in effect. Look out for temporary traffic lights. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until September 1, 2021 at about 11:59PM CDT.
NE 21 in both directions: Width limit in effect, road construction, temporary traffic light, bridge construction. Width limit 11'0". Speed limit 35 MPH.
NE 21 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, look out for flagger, temporary traffic light, bridge construction. Speed limit 35 MPH. Width limit 11'0".
NE 21 in both directions: Width limit in effect, temporary traffic light, roadway reduced to one lane, due to road construction work, look out for flagger, pilot car in operation. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction