NDOR Logo
Truck Restrictions on I-80
I-80
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0".
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. The roadway is shared with opposing traffic. Width limit 10'0". Until November 1, 2021 at about 5:00PM MDT.
Between Exit 107: NE 25B Link; Big Springs and Exit 133: NE 51B Link; Roscoe (Ogallala). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Width limit 11'0". Until November 10, 2021 at about 11:59PM MDT.
Between Exit 291: NE 10D Link; Shelton and Exit 305: NE 40C Link; Alda (Kearney). There is a width limit in effect. A lane is closed intermittently due to road construction work. The entrance ramp is closed. Width limit 12'0". Until November 1, 2021 at about 5:00PM CDT.
Between Exit 332: NE 14; Aurora (5 miles east of Aurora) and Exit 348: NE 93E Link; Bradshaw;County Road H (7 miles west of York). There is a width limit in effect. A lane is closed intermittently because of night time construction work. Width limit 12'0". From 7:00PM CDT to 10:00AM CDT on weekdays.
Between Exit 369: NE 80E Link; Beaver Crossing (19 miles east of York) and Exit 382: NE 80H Link; Milford (16 miles west of Lincoln). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Until July 30, 2021 at about 5:00PM CDT.