NDOR Logo
Truck Restrictions on NE 8
NE 8
Between Market Street (Hardy) and US 81 (Chester). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 2, 2021 at about 5:00PM CDT.
Between Hubbell Road and 558th Avenue (Reynolds). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 30, 2021 at about 7:00PM CDT.
Between South 108 Road and NE 99 (Barneston). There is a width limit in effect due to road construction work. Until November 30, 2021 at about 5:00PM CDT.