NDOR Logo
NE 15 in both directions: Bridge closed, due to road construction work, see map for detour(s).
NE 15 in both directions: Bridge closed.

Between NE 4; 724th Road and NE 76C Spur; County Road V (Fairbury). The bridge is closed due to road construction work. Until August 16, 2019 at about 5:00PM CDT.

on June 27
NE 15 in both directions: Bridge closed.
Map of NE 15 in both directions: Bridge closed.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction