NDOR Logo
Check out our new 511 website and leave us feedback!.
Road Reports
US 275 Whole Road 5 reports
O'Neill to Norfolk No reports
Norfolk to Iowa 5 reports
Reports on US 275
Map of Reports on US 275 Between Q Road and P Road (Wisner). Traffic restrictions are in force due to road construction work and because the roadway is reduced to one lane and because of temporary traffic lights. Width limit 11'0". Between B Road (5 miles east of West Point) and Pebble Street (1 mile west of Scribner). Road construction work is in progress. A lane is closed intermittently. Between Morningside Road and NE 64 (Fremont). A lane is closed intermittently due to road construction work. Until August 31, 2021 at about 11:59PM CDT.
US 275 in both directions: Traffic restrictions in force, due to road construction work, because the roadway is reduced to one lane, because of temporary traffic light.
US 275 eastbound: Road construction, intermittent lane closure.
US 275 in both directions: Intermittent lane closure, due to road construction work.
US 275 eastbound: Right lane closed, because of utility work.
US 275 in both directions: Roadway reduced to one lane, due to road work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure