NDOR Logo
Reports on I-80
I-80
Between Exit 8: NE 53C Link; Bushnell and Wyoming State Line (Pine Bluffs). Road construction work is in progress.
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). Road construction work is in progress.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress because of the width limit. Width limit 12'0". Until Friday, at about 5:00PM MST.
--- Citizen Update ---
Between Exit 117: NE 51A Link; Brule and Exit 107: NE 25B Link; Big Springs (19 miles west of the Ogallala exit). A Waze user reported fog.
Between Exit 117: NE 51A Link; Brule and Exit 126: NE 61; US 26; Ogallala;Grant (2 miles west of the Ogallala exit). The rest area is closed.
Between Exit 291: NE 10D Link; Shelton (23 miles east of Kearney) and Exit 314: Locust Street;Grand Island (20 miles west of Aurora). Road construction work is in progress. Until March 30, 2020 at about 5:00PM CST.
Between Exit 445: L Street and Exit 442: Giles Road;Harrison Street (near Omaha). Look out for a crash. The right shoulder is closed.