NDOR Logo
US 77
US 77 in both directions: Width limit in effect, intermittent lane closure, because of road maintenance activitie.
Between South 12th Street (4 miles north of Cortland) and NE 55W Link (Lincoln). There is a width limit in effect. A lane is closed intermittently because of road maintenance activities. Width limit 12'0".
US 77 northbound: Width limit in effect, due to road construction work.
Between Yankee Hill Road and NE 55W Link (near Lincoln). There is a width limit in effect due to road construction work. Width limit 11'0".
US 77 in both directions: Width limit in effect, intermittent lane closure, due to road construction work.
Between NE 55E Spur and CR A; County Road A (Ceresco). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Until September 30, 2019 at about 6:00PM CDT.
US 77 in both directions: Road construction, intermittent lane closure.
Between Boulevard Street (Inglewood) and West 4th Street (Fremont). Road construction work is in progress. A lane is closed intermittently. Width limit 12'0".
US 77 in both directions: Intermittent lane closure, because of road maintenance activities, width limit in effect.
Between Ridgeland Avenue (Inglewood) and West 4th Street (Fremont). A lane is closed intermittently because of road maintenance activities. There is a width limit in effect. Width limit 12'0".
US 77 in both directions: Road construction.
Between County Road B (near Uehling) and NE 32 (1 mile south of Oakland). Road construction work is in progress.
US 77 in both directions: Traffic restrictions in force, road construction, because the roadway is reduced to one lane.
Between 1st Street and County Road H (near Uehling). Traffic restrictions are in force. Road construction work is in progress because the roadway is reduced to one lane. Width limit 12'0".
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 77
Map of Reports on US 77 Between South 12th Street (4 miles north of Cortland) and NE 55W Link (Lincoln). There is a width limit in effect. A lane is closed intermittently because of road maintenance activities. Width limit 12'0". Between NE 55E Spur and CR A; County Road A (Ceresco). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Until September 30, 2019 at about 6:00PM CDT. Between Boulevard Street (Inglewood) and West 4th Street (Fremont). Road construction work is in progress. A lane is closed intermittently. Width limit 12'0". Between Ridgeland Avenue (Inglewood) and West 4th Street (Fremont). A lane is closed intermittently because of road maintenance activities. There is a width limit in effect. Width limit 12'0". Between County Road B (near Uehling) and NE 32 (1 mile south of Oakland). Road construction work is in progress.
US 77 in both directions: Width limit in effect, intermittent lane closure, because of road maintenance activitie.
US 77 northbound: Width limit in effect, due to road construction work.
US 77 in both directions: Width limit in effect, intermittent lane closure, due to road construction work.
US 77 in both directions: Road construction, intermittent lane closure.
US 77 in both directions: Intermittent lane closure, because of road maintenance activities, width limit in effect.
US 77 in both directions: Road construction.
US 77 in both directions: Traffic restrictions in force, road construction, because the roadway is reduced to one lane.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure