NDOR Logo
Reports on I-80
I-80
Between Exit 8: NE 53C Link; Bushnell and Wyoming State Line (Pine Bluffs). Road construction work is in progress.
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. Width limit 12'0".
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Until December 20, 2019 at about 5:00PM MST.
Between Exit 107: NE 25B Link; Big Springs and Exit 101: US 138; Big Springs;Julesburg (Ogallala). The right lane is closed due to road construction work.
Between Exit 107: NE 25B Link; Big Springs and Exit 126: NE 61; US 26; Ogallala;Grant (Ogallala). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Speed limit 65 MPH. Until December 20, 2019 at about 5:00PM MST.
Between Exit 117: NE 51A Link; Brule and Exit 126: NE 61; US 26; Ogallala;Grant (2 miles west of the Ogallala exit). The rest area is closed.
Between Exit 133: NE 51B Link; Roscoe and Exit 117: NE 51A Link; Brule (Ogallala). The left lane is closed due to road construction work.
Between Exit 291: NE 10D Link; Shelton (23 miles east of Kearney) and Exit 314: Locust Street;Grand Island (20 miles west of Aurora). Road construction work is in progress. Until March 30, 2020 at about 5:00PM CST.