NDOR Logo
NE 79
NE 79 in both directions: Work on the shoulder, due to road construction work, look out for flagger.
Between NE 55J Spur; West Raymond Road and NE 66; South Street (Valparaiso). There is work on the shoulder due to road construction work. Look out for flaggers. Until December 18, 2020 at about 5:00PM CST.
NE 79 in both directions: Traffic incident reported, due to road construction work.
Between County Road S and County Road R (North Bend). A traffic incident is reported due to road construction work.
NE 79 in both directions: Road construction.
Between County Road S and County Road R (1 mile north of North Bend). Road construction work is in progress.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on NE 79
Map of Reports on NE 79 Between NE 55J Spur; West Raymond Road and NE 66; South Street (Valparaiso). There is work on the shoulder due to road construction work. Look out for flaggers. Until December 18, 2020 at about 5:00PM CST. Between County Road S and County Road R (North Bend). A traffic incident is reported due to road construction work.
NE 79 in both directions: Work on the shoulder, due to road construction work, look out for flagger.
NE 79 in both directions: Traffic incident reported, due to road construction work.
NE 79 in both directions: Road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure