NDOR Logo
NE 11
NE 11 in both directions: Road construction, look out for flagger.
Between Pope Street (North Loup) and South 10th Street (near Ord). Road construction work is in progress. Look out for flaggers. Until May 1, 2020 at about 5:00PM CST.
NE 11 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, temporary traffic light.
Between NE 95 and East South Street (19 miles south of Atkinson). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Width limit 12'0".
NE 11 in both directions: Roadway reduced to one lane, due to road construction work, look out for flagger.
Between River Road and NE 12 (Butte). The roadway is reduced to one lane due to road construction work. Look out for flaggers.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on NE 11
Map of Reports on NE 11 Between Pope Street (North Loup) and South 10th Street (near Ord). Road construction work is in progress. Look out for flaggers. Until May 1, 2020 at about 5:00PM CST. Between River Road and NE 12 (Butte). The roadway is reduced to one lane due to road construction work. Look out for flaggers.
NE 11 in both directions: Road construction, look out for flagger.
NE 11 in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, temporary traffic light.
NE 11 in both directions: Roadway reduced to one lane, due to road construction work, look out for flagger.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure