NDOR Logo
I-80
I-80: Width limit in effect, road construction.
Between Wyoming State Line and Exit 20: NE 71; Kimball (Pine Bluffs). There is a width limit in effect. Road construction work is in progress. Width limit 12'0".
I-80: Width limit in effect, road construction, roadway reduced to two lane.
Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0".
I-80: Road construction, roadway reduced to two lanes, traffic restrictions in force.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force.
I-80 eastbound: Left lane closed, due to road construction work.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 102: I-76; North 14th Street; Sidney (Ogallala). The left lane is closed due to road construction work.
I-80 in both directions: Width limit in effect, roadway reduced to one lane, opposing traffic sharing the roadway, due to road construction work.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. The roadway is reduced to one lane. The roadway is shared with opposing traffic due to road construction work. Width limit 10'0". Until October 1, 2020 at about 5:00PM MDT.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Multiple Waze users reported road construction.
I-80 eastbound: Left lane closed, due to road construction work.
Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). The left lane is closed due to road construction work.
I-80 westbound: Left lane closed, due to road construction work.
Between Exit 107: NE 25B Link; Big Springs and Exit 102: I-76; North 14th Street; Sidney (Ogallala). The left lane is closed due to road construction work.
I-80 eastbound: Road closed.
Between Exit 117: NE 51A Link; Brule and Exit 126: NE 61; US 26; Ogallala;Grant (2 miles west of the Ogallala exit). The road is closed.
I-80 eastbound: Rest area closed.
Between Exit 117: NE 51A Link; Brule and Exit 126: NE 61; US 26; Ogallala;Grant (2 miles west of the Ogallala exit). The rest area is closed.
I-80 westbound: Standtill traffic. --- Citizen Update ---
Between Exit 126: NE 61; US 26; Ogallala;Grant and Exit 117: NE 51A Link; Brule (1 mile west of the Ogallala exit). A Waze user reported standstill traffic.
I-80 westbound: Road closed, exit ramp closed.
Between Exit 133: NE 51B Link; Roscoe and Exit 126: NE 61; US 26; Ogallala;Grant (5 miles east of Ogallala). The road is closed. The exit ramp is closed.
I-80 westbound: Rest area closed.
Between Exit 133: NE 51B Link; Roscoe and Exit 126: NE 61; US 26; Ogallala;Grant (5 miles east of Ogallala). The rest area is closed.
I-80 westbound: Rest area closed.
Between Exit 199: NE 56D Link; Brady and Exit 190: NE 56A Spur; Maxwell (15 miles east of North Platte). The rest area is closed.
I-80 in both directions: Traffic restrictions in force.
Between Exit 190: NE 56A Spur; Maxwell and Exit 199: NE 56D Link; Brady (15 miles east of North Platte). Traffic restrictions are in force.
I-80 in both directions: Width limit in effect.
Between Exit 324: NE 41B Spur; Giltner and Exit 342: NE 93A Spur; Henderson;Bradshaw (Aurora). There is a width limit in effect. Width limit 12'0".
I-80 eastbound: Moderate traffic jam. --- Citizen Update ---
Between Exit 324: NE 41B Spur; Giltner and Exit 332: NE 14; Aurora (2 miles west of Aurora). A Waze user reported a moderate traffic jam.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 324: NE 41B Spur; Giltner and Exit 332: NE 14; Aurora (1 mile west of Aurora). A Waze user reported road construction.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 353: US 81; York;Geneva and Exit 360: NE 93B Link; Waco (6 miles east of York). A Waze user reported road construction.
I-80 in both directions: Width limit in effect, due to road construction work.
Between Exit 353: US 81; York;Geneva and Exit 369: NE 80E Link; Beaver Crossing (York). There is a width limit in effect due to road construction work. Width limit 12'0". Until December 1, 2020 at about 5:00PM CDT.
I-80 in both directions: Exit ramp closed, roadway reduced to one lane, due to road construction work.
Between Exit 369: NE 80E Link; Beaver Crossing (18 miles east of York) and Exit 388: NE 103; Crete (13 miles west of Lincoln). The exit ramp is closed. The roadway is reduced to one lane due to road construction work.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 403: 27th Street; State Fair Park and Exit 405: US 77 (Lincoln). A Waze user reported road construction.
I-80 in both directions: Roadway reduced to two lanes, due to road construction work.
Between Exit 403: 27th Street; State Fair Park and Exit 405: US 77 (near Lincoln). The roadway is reduced to two lanes due to road construction work.
I-80 in both directions: Width limit in effect, due to road construction work.
Between Exit 403: 27th Street; State Fair Park and Exit 409: US 6; East Lincoln; Waverly (Lincoln). There is a width limit in effect due to road construction work. Width limit 12'0". Until October 1, 2020 at about 5:00PM CDT.
I-80 in both directions: Intermittent lane closure, due to road construction work, entrance ramp closed.
Between Exit 405: US 77 and Exit 426: NE 66; Mahoney State Park; Ashland; South Bend (Lincoln). A lane is closed intermittently due to road construction work. The entrance ramp is closed.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 409: US 6; East Lincoln; Waverly and Exit 420: NE 63; Ashland;Greenwood (7 miles east of Lincoln). A Waze user reported road construction.
I-80 eastbound: Road construction. --- Citizen Update ---
Between Exit 420: NE 63; Ashland;Greenwood and Exit 426: NE 66; Mahoney State Park; Ashland; South Bend (18 miles west of Omaha). A Waze user reported road construction.
I-80 in both directions: Width limit in effect, intermittent lane closure, center lane closed, due to road construction work.
Between Exit 426: NE 66; Mahoney State Park; Ashland; South Bend and Exit 432: NE 31; Gretna;Louisville (Omaha). There is a width limit in effect. A lane is closed intermittently. The center lane is closed due to road construction work. Width limit 12'0". Until November 30, 2020 at about 5:00PM CDT.
I-80 in both directions: Left shoulder closed, because people are working in the median.
Between Exit 426: NE 66; Mahoney State Park; Ashland; South Bend and Exit 432: NE 31; Gretna;Louisville (14 miles west of Omaha). The left shoulder is closed because people are working in the median.
I-80 in both directions: Left shoulder closed, work in the median.
Between Exit 450: 60th Street and Exit 451: 42nd Street (Omaha). The left shoulder is closed. People are working in the median.
I-80 eastbound: Road construction, width limit in effect.
Between Exit 451: 42nd Street and Exit 453: US 75; South 24th Street (Omaha). Road construction work is in progress. There is a width limit in effect. Width limit 11'0".
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-80
Map of Reports on I-80 Between Wyoming State Line and Exit 20: NE 71; Kimball (Pine Bluffs). There is a width limit in effect. Road construction work is in progress. Width limit 12'0". Between Exit 85: NE 25A Link; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs;Julesburg (31 miles west of the Ogallala exit). There is a width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Width limit 12'0". Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Road construction work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force. Between Exit 101: US 138; Big Springs;Julesburg and Exit 102: I-76; North 14th Street; Sidney (Ogallala). The left lane is closed due to road construction work. Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. The roadway is reduced to one lane. The roadway is shared with opposing traffic due to road construction work. Width limit 10'0". Until October 1, 2020 at about 5:00PM MDT. Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). Multiple Waze users reported road construction. Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). The left lane is closed due to road construction work. Between Exit 107: NE 25B Link; Big Springs and Exit 102: I-76; North 14th Street; Sidney (Ogallala). The left lane is closed due to road construction work. Between Exit 324: NE 41B Spur; Giltner and Exit 342: NE 93A Spur; Henderson;Bradshaw (Aurora). There is a width limit in effect. Width limit 12'0". Between Exit 353: US 81; York;Geneva and Exit 369: NE 80E Link; Beaver Crossing (York). There is a width limit in effect due to road construction work. Width limit 12'0". Until December 1, 2020 at about 5:00PM CDT. Between Exit 369: NE 80E Link; Beaver Crossing (18 miles east of York) and Exit 388: NE 103; Crete (13 miles west of Lincoln). The exit ramp is closed. The roadway is reduced to one lane due to road construction work. Between Exit 403: 27th Street; State Fair Park and Exit 409: US 6; East Lincoln; Waverly (Lincoln). There is a width limit in effect due to road construction work. Width limit 12'0". Until October 1, 2020 at about 5:00PM CDT. Between Exit 405: US 77 and Exit 426: NE 66; Mahoney State Park; Ashland; South Bend (Lincoln). A lane is closed intermittently due to road construction work. The entrance ramp is closed. Between Exit 426: NE 66; Mahoney State Park; Ashland; South Bend and Exit 432: NE 31; Gretna;Louisville (Omaha). There is a width limit in effect. A lane is closed intermittently. The center lane is closed due to road construction work. Width limit 12'0". Until November 30, 2020 at about 5:00PM CDT. Between Exit 451: 42nd Street and Exit 453: US 75; South 24th Street (Omaha). Road construction work is in progress. There is a width limit in effect. Width limit 11'0".
I-80: Width limit in effect, road construction.
I-80: Width limit in effect, road construction, roadway reduced to two lane.
I-80: Road construction, roadway reduced to two lanes, traffic restrictions in force.
I-80 eastbound: Left lane closed, due to road construction work.
I-80 in both directions: Width limit in effect, roadway reduced to one lane, opposing traffic sharing the roadway, due to road construction work.
I-80 eastbound: Road construction.
I-80 eastbound: Left lane closed, due to road construction work.
I-80 westbound: Left lane closed, due to road construction work.
I-80 eastbound: Road closed.
I-80 eastbound: Rest area closed.
I-80 westbound: Standtill traffic.
I-80 westbound: Road closed, exit ramp closed.
I-80 westbound: Rest area closed.
I-80 westbound: Rest area closed.
I-80 in both directions: Traffic restrictions in force.
I-80 in both directions: Width limit in effect.
I-80 eastbound: Moderate traffic jam.
I-80 eastbound: Road construction.
I-80 eastbound: Road construction.
I-80 in both directions: Width limit in effect, due to road construction work.
I-80 in both directions: Exit ramp closed, roadway reduced to one lane, due to road construction work.
I-80 eastbound: Road construction.
I-80 in both directions: Roadway reduced to two lanes, due to road construction work.
I-80 in both directions: Width limit in effect, due to road construction work.
I-80 in both directions: Intermittent lane closure, due to road construction work, entrance ramp closed.
I-80 eastbound: Road construction.
I-80 eastbound: Road construction.
I-80 in both directions: Width limit in effect, intermittent lane closure, center lane closed, due to road construction work.
I-80 in both directions: Left shoulder closed, because people are working in the median.
I-80 in both directions: Left shoulder closed, work in the median.
I-80 eastbound: Road construction, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure