NDOR Logo
Reports on US 83
US 83
Between Red Willow Dam Road and NE 23 (McCook). The roadway is reduced to one lane due to road construction work. Look out for flaggers.
Between NE 2 and NE 57A Spur; NE 92 (North Platte). Road marking work is in progress. Look out for a slow moving maintenance vehicle. Until today at about 4:00PM CDT.
Between NE 2 (64 miles north of North Platte) and Brownlee Road (56 miles south of Valentine). Road construction work is in progress. There is a width limit in effect.
Between NE 2 and Brownlee Road (Valentine). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 1, 2020 at about 5:00PM CDT.