NDOR Logo
NE 56G Link
NE 56G Link in both directions: Road construction, width limit in effect, temporary traffic lights, delay.
Between I-80; Newberry Access Road and US 30 (North Platte). Road construction work is in progress. There is a width limit in effect. Look out for temporary traffic lights. Expect delays. Width limit 12'0". Until December 1, 2020 at about 5:00PM CDT.
NE 56G Link in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, temporary traffic light.
Between Halligan Drive and US 30 (North Platte). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Width limit 12'0".
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on NE 56G Link
Map of Reports on NE 56G Link Between I-80; Newberry Access Road and US 30 (North Platte). Road construction work is in progress. There is a width limit in effect. Look out for temporary traffic lights. Expect delays. Width limit 12'0". Until December 1, 2020 at about 5:00PM CDT. Between Halligan Drive and US 30 (North Platte). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Width limit 12'0".
NE 56G Link in both directions: Road construction, width limit in effect, temporary traffic lights, delay.
NE 56G Link in both directions: Width limit in effect, roadway reduced to one lane, due to road construction work, temporary traffic light.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure