NDOR Logo
Check out our new 511 website and leave us feedback!.
US 81
US 81 in both directions: Roadway reduced to one lane, due to road construction work.
Between NE 93D Spur and US 34 (York). The roadway is reduced to one lane due to road construction work.
US 81 northbound: Left lane closed, because of road maintenance activitie.
Between 51st Avenue and Lost Creek Expressway (Columbus). The left lane is closed because of road maintenance activities.
US 81 northbound: Road construction.
Between 287 Street and 370 Street (Columbus). Road construction work is in progress.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 81
Map of Reports on US 81 Between NE 93D Spur and US 34 (York). The roadway is reduced to one lane due to road construction work. Between 51st Avenue and Lost Creek Expressway (Columbus). The left lane is closed because of road maintenance activities. Between 287 Street and 370 Street (Columbus). Road construction work is in progress.
US 81 in both directions: Roadway reduced to one lane, due to road construction work.
US 81 northbound: Left lane closed, because of road maintenance activitie.
US 81 northbound: Road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure