NDOR Logo
NE 61 in both directions: Width limit in effect, work on the shoulder.
NE 61 in both directions: Width limit in effect.

Between Survey Valley Road (28 miles north of Hyannis) and Shadbolt Road (23 miles south of Merriman). Width limit in effect. Work on the shoulder. Width limit 11'0". Starting March 8, 2021 at 7:00AM MST.

on March 2
Starting March 8, 2021 at 7:00AM MST
Map of Starting March 8, 2021 at 7:00AM MST
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure