NDOR Logo
US 83 in both directions: Road construction, width limit in effect.
US 83 in both directions: Road construction.

Between NE 2 (64 miles north of North Platte) and Brownlee Road (56 miles south of Valentine). Road construction work is in progress. There is a width limit in effect.

Web Comment: Work will begin April 13 on US-83 north of Thedford, from Reference Post 149+25 to Reference Post 156+56 Work includes flume replacement, asphalt surfacing and seeding. Traffic will be maintained with daytime lane closures with flaggers and a pilot car. Anticipated completion is summer 2020. Motorists are reminded to drive cautiously in and near construction zones, to expect delay and alolow for additional travel time. Always buckle up and do not use your cell phone while driving in a work zone.

on April 7
US 83 in both directions: Road construction.
Map of US 83 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Flooding Flooding
Info Info Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction
Hazard Waze: Hazard Accident Waze: Accident Closure Waze: Closure