NDOR Logo
Cameras—Statewide
Map of Statewide Between Exit 432: NE 31; Gretna;Louisville and Exit 439: NE 370; Gretna (Omaha). Roadway reduced to one lane. Center lane closed. Left lane closed due to night time construction work. Starting today at 8:00PM CDT until tomorrow at about 1:00AM CDT. Between I-80 and Adams Road (David City). There is a width limit in effect due to road construction work. Width limit 10'0". Between Cordelia Street and Old Highway 50 (Tecumseh). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Look out for flaggers. A pilot car is in operation. Width limit 11'0". Until November 30, 2021 at about 5:00PM CDT. Between Canal Road and US 6 (Trenton). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Look out for temporary traffic lights. Width limit 12'0". Until December 31, 2021 at about 11:59PM CDT. Between Exit 442: Giles Road;Harrison Street and Exit 440: NE 50; 144th Street;West Omaha (Omaha). Right lane closed due to night time construction work. Right shoulder closed. Starting today at 8:00PM CDT until tomorrow at about 6:00AM CDT. Between Exit 101: US 138; Big Springs;Julesburg and Exit 107: NE 25B Link; Big Springs (Ogallala). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. The roadway is shared with opposing traffic. Width limit 10'0". Until November 1, 2021 at about 5:00PM MDT. Between Memorial Drive and US 183 (Broken Bow). There is work on the shoulder. Road maintenance work is in progress. Between Weissert Road and US 183 (Broken Bow). Road maintenance work is in progress. There is work on the shoulder. Between Exit 450: 60th Street and Exit 453: US 75; South 24th Street (Omaha). Road construction work is in progress. Between US 30 and West Faidley Avenue (Grand Island). A lane is closed intermittently due to road construction work. Until November 1, 2021 at about 11:59PM CDT. Between NE 91D Link (near Blue Hill) and US 6; West J Street (Hastings). There is a width limit in effect. The shoulder is closed. Width limit 12'0". Until December 1, 2021 at about 5:00PM CDT. Between Sunset Drive and Road 771 (Lexington). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Speed limit 35 MPH. Width limit 11'0". Until August 31, 2021 at about 5:00PM CDT. Between North Loup River Road and Pleasant Valley Road (Ainsworth). There is a width limit in effect due to road construction work. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Width limit 12'0". Until November 12, 2021 at about 5:00PM CDT. Between Colorado State Line and I-80. There is a width limit in effect. The roadway is reduced to one lane due to road construction work. The roadway is shared with opposing traffic. Width limit 10'0". Until November 1, 2021 at about 5:00PM MDT. Between NE 23 and Johansen Drive (Cozad). There is a width limit in effect. Road construction work is in progress. Look out for temporary traffic lights. Width limit 11'0". Speed limit 35 MPH. Until October 15, 2021 at about 5:00PM CDT. Between South 108 Road and NE 99 (Barneston). There is a width limit in effect due to road construction work. Until November 30, 2021 at about 5:00PM CDT. Between North 2nd Road and NE 43 (Lincoln). Road construction work is in progress. Width limit 12'0". Between US 34 and East 94th Street (Trumbull). The road is rough because the road surface is in poor condition. Between County Road G and US 81; County Road 123 (Polk). The road surface is in poor condition. The road is rough. Between NE 55F Spur; NE 33 and NE 55W Link (Lincoln). There is a width limit in effect due to road construction work. The roadway is reduced to two lanes. The roadway is shared with opposing traffic. Width limit 12'0". Between Memorial Drive and US 183 (Broken Bow). There is a width limit in effect. There is a weight limit in effect. Between Exit 426: NE 66; Mahoney State Park; Ashland; South Bend and Exit 442: Giles Road;Harrison Street (Omaha). Night time construction work is in progress. A lane is closed intermittently. Between Sycamore Street (near Cairo) and West Nebraska Highway 2 (Grand Island). The road is rough. The road surface is in poor condition. Between North Park Avenue and US 34 (Murray). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. There is a width limit in effect. Width limit 11'0". Between Road 774 and Old Highway 21 (Oconto). There is a width limit in effect. Look out for temporary traffic lights. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until September 1, 2021 at about 11:59PM CDT. Between US 136 and the end of NE 46 (Oxford). The roadway is reduced to one lane due to road construction work. Look out for flaggers. Between NE 46; Ogden Street (Oxford) and Western Avenue (Orleans). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Look out for flaggers. Between Survey Valley Road (28 miles north of Hyannis) and Shadbolt Road (23 miles south of Merriman). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Width limit 11'0". Until July 30, 2021 at about 5:00PM MDT. Between NE 8; 705th Road and Castor Street (Diller). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Width limit 12'0". Until July 31, 2021 at about 5:00PM CDT. Between NE 34D Spur; West Pickrell Road (6 miles north of Beatrice) and East Aspen Road (2 miles south of Cortland). There is a width limit in effect. A lane is closed intermittently due to road construction work. Look out for flaggers. Width limit 12'0". Until December 15, 2021 at about 5:00PM CDT. Between Exit 291: NE 10D Link; Shelton and Exit 305: NE 40C Link; Alda (Kearney). There is a width limit in effect. A lane is closed intermittently due to road construction work. The entrance ramp is closed. Width limit 12'0". Until November 1, 2021 at about 5:00PM CDT. Between 385th Road (1 mile north of Ravenna) and NE 58 (Rockville). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until June 1, 2021 at about 5:00PM CDT. Between Z Z Road and Carl Street (Fullerton). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Look out for flaggers. A pilot car is in operation. Until July 16, 2021 at about 5:00PM CDT. Between North 3rd Street and NE 52; Belgrade Road (Fullerton). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Look out for flaggers. A pilot car is in operation. Until July 16, 2021 at about 5:00PM CDT. Between Exit 369: NE 80E Link; Beaver Crossing (19 miles east of York) and Exit 388: NE 103; Crete (13 miles west of Lincoln). There is a width limit in effect. A lane is closed intermittently due to road construction work. Width limit 12'0". Until July 30, 2021 at about 5:00PM CDT. Between NE 2 and County Road L-5B (Taylor). There is a width limit in effect. Width limit 11'0". Between NE 14 (5 miles west of Hordville) and US 81; County Road 123 (9 miles east of Polk). There is a width limit in effect. A lane is closed intermittently because of road maintenance activities. Look out for flaggers. Width limit 10'0". Axle weight limit 19,000 lbs. No vehicles over 95,000 lbs. Between Road 93 (11 miles north of Bridgeport) and Wayne Road (8 miles south of Alliance). Road construction work is in progress. Look out for flaggers. Until November 1, 2022 at about 5:00PM MDT. Between NE 31; Nebraska Crossing Drive (1 mile west of Gretna) and North 192nd Street (Omaha). A lane is closed intermittently due to road construction work. Between Exit 107: NE 25B Link; Big Springs and Exit 133: NE 51B Link; Roscoe (Ogallala). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Width limit 11'0". Until November 10, 2021 at about 11:59PM MDT. Between Summit Avenue and 73; East J Street (Hastings). There is a width limit in effect. The roadway is reduced to two lanes due to road construction work. Look out for flaggers. Width limit 12'0". Until November 12, 2021 at about 5:00PM CDT. Between Renwick Street and US 81 (Carleton). The road is rough. Speed limit 45 MPH. Between County Road 272 and US 20; East Douglas Street (O""Neill). There is a width limit in effect. There is a length limit in effect. A lane is closed intermittently due to road construction work. Look out for flaggers. Width limit 10'0". Vehicle length limit 80 ft. Until November 19, 2021 at about 5:00PM CDT. Between NE 42A Spur and US 6 (Holdrege). A lane is closed intermittently due to road construction work. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Until November 15, 2021 at about 5:00PM CDT. Between Fawn Lake Road and 5th Avenue (Merriman). A lane is closed intermittently due to road construction work. Look out for flaggers. A pilot car is in operation. Until July 30, 2021 at about 5:00PM MDT. Between I-80 and US 30; Road 14 (Brule). There is a width limit in effect due to road construction work. Look out for temporary traffic lights. There is a weight limit in effect. Width limit 11'0". Until November 7, 2021 at about 5:00PM MDT. Between KS 63; Kansas State Line and NE 8 (Du Bois). The roadway is reduced to one lane because of road maintenance activities. Look out for flaggers. A pilot car is in operation. Until April 1, 2022 at about 11:59PM CDT. Between County Road 21 and NE 92; Road O (David City). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Width limit 12'0". Until November 30, 2021 at about 5:00PM CDT. Between County Road 129 (2 miles south of Osceola) and Elm Street (Shelby). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Width limit 12'0". Until August 1, 2021 at about 5:00PM CDT. Between Exit 107: NE 25B Link; Big Springs and Exit 126: NE 61; US 26; Ogallala;Grant (Ogallala). The roadway is shared with opposing traffic due to road construction work. Between North 23rd Avenue (Blair) and County Road A (near Herman). A lane is closed intermittently due to road construction work. There is a width limit in effect. Width limit 11'0". Until November 30, 2022 at about 11:59PM CDT. Between Red Willow Dam Road and NE 23 (McCook). The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Between County Road S and County Road R (North Bend). A traffic incident is reported due to road construction work. Between Morningside Road and NE 64 (Fremont). A lane is closed intermittently due to road construction work. Until August 31, 2021 at about 11:59PM CDT. Between Old Post Road and US 30 (Sidney). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Width limit 12'0". Until November 30, 2021 at about 5:00PM MDT. Between I-80 and Exit 6: NE 133; Blair High Road (Omaha). Night time construction work is in progress. A lane is closed intermittently. The entrance ramp is closed. The exit ramp is closed. Between Elm Street and US 81; County Road 123 (Polk). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 11'0". Until July 2, 2021 at about 5:00PM CDT. Between NE 91 and West South Street (Ainsworth). The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Between North Loup River Road and Pleasant Valley Road (Ainsworth). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Between Exit 332: NE 14; Aurora (5 miles east of Aurora) and Exit 348: NE 93E Link; Bradshaw;County Road H (7 miles west of York). There is a width limit in effect. A lane is closed intermittently because of night time construction work. Width limit 12'0". From 7:00PM CDT to 10:00AM CDT on weekdays. Between Exit 324: NE 41B Spur; Giltner and Exit 342: NE 93A Spur; Henderson;Bradshaw (Aurora). There is a width limit in effect. A lane is closed intermittently due to road construction work. Night time construction work is in progress. Width limit 12'0". Until November 30, 2021 at about 10:00AM CDT. Between Hartley Street (Superior) and Church Street (near Chester). The road is rough because the road surface is in poor condition. Speed limit 50 MPH. Between Market Street (Hardy) and US 81 (Chester). There is a width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. A pilot car is in operation. Width limit 12'0". Until July 2, 2021 at about 5:00PM CDT. Between Ogallala Beach Road and McGinley Lake Road (Ogallala). Traffic restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Between Exit 126: NE 61; US 26; Ogallala;Grant and Exit 107: NE 25B Link; Big Springs (Ogallala). The right lane is closed due to road construction work. Between East Rolla Avenue (Anselmo) and West Center Avenue (Merna). Traffic restrictions are in force. There is a weight limit in effect. Between 2102 and 2108 (Mullen). There is a width limit in effect. Road construction work is in progress. Look out for flaggers. A pilot car is in operation. Look out for temporary traffic lights. Width limit 10'0". Until December 1, 2021 at about 5:00PM MDT. Between Road B (5 miles east of Hampton) and US 81 (York). The road is closed due to road construction work. Until November 11, 2021 at about 5:00PM CDT. Between Iowa State Line and Capitol Avenue (Omaha). Road construction work is in progress. A lane is closed intermittently. The entrance ramp is closed. The exit ramp is closed. Width limit 12'0".
I-80: Waverly Exit
NE 29: N of Mitchell
I-80: Potter Exit
US 77: W of Roca
I-80: Brady at 201
NE 370: Papillion 84th St
I-80: 184 Platte River Bridge
US 20: Rushville
I-80: WYO Line
US 6: US 6 at Hwy 103
NE 61: N of Hyannis
US 30: Fremont at 23rd St
US 77: S of Wymore
I-80: Kearney Exit 272
US 281: N of Bartlett
NE 1: Operations Trailer 3
I-80: I 80 at 412
US 6: Dodge St at 144th
US 6: West Dodge at 102nd
US 75: Capehart Rd in Bellevue
US 275: N of West Point
US 81: Tarnov
US 183: Springview
US 26: Hwy 26 E of Broadwater
I-80: Roscoe Interchange
US 77: S of Cortland
US 75: NE City
I-80: 42nd St in Omaha
I-80: Aurora Jct 14
US 75: South Omaha
NE 2: Palmyra
US 281: South Spencer
NE 23: East of Grant
NE 2: Dunning
NE 12: Brocksburg
I-80: Minden Exit
US 136: North of Alma
NE 4: E of Campbell
US 20: W of Hay Springs
NE 11: East Butte
I-80: N Jct 77 at Lincoln
US 77: S of Ceresco
US 26: Oshkosh
I-80: Aurora DMS
I-80: Grand Island WB Rest Area
NE 2: NE 2 East of Bingham
I-80: Lodgepole Exit
I-680: Blair High Road
I-80: Grand Island Locust St Exit
I-80: Henderson Exit
NE 2: Hwy 2 at Antioch
NE 35: W of Wayne
US 20: Inman
US 77: Hwy 77 at Hwy 103 Wahoo
US 385: Hemingford
US 75: S of Julian Spur S64A
I-80: L Street in Omaha
US 6: W Dodge at 128th
I-80: 72nd St in Omaha
I-80: I 80 at EB Rest Area
US 281: S of Barlett
I-180: Superior St.
US 20: Whitney Spur
NE 2: West of Hemmingford
NE 15: W of Wilber
I-80: I 80 at 393
I-80: Bridge 181 E of North Platte
I-80: Darr Exit
NE 61: Martin Bay at Ogallala
I-80: Exit 440
NE 2: Ellsworth
I-480: Dodge St.
I-80: Holdrege-Elm Creek Exit
US 385: N of Bridgeport
US 34: Benkelman
I-80: I 80 at 404
US 183: Rose - S of Bassett
US 30: Blair Roundabout
US 385: South Chadron
NE 56: W of Cedar Rapids
I-80: Exit 102
I-80: Wood River
US 77: Pioneers blvd
NE 12: S of Ponca
I-80: Missouri River Bridge
I-80: Exit 101
NE 31: Elkhorn
NE 88: 88 at 3.5
I-80: Aurora Anti-Icing
US 20: E of Newport
US 77: Lyons
I-129: Jct at So Sioux City
US 75: US 34 and NE 66 at Plattsmouth
I-80: Milford Exit
NE 71: N of Kimball
I-680: 31st St in N Omaha
US 6: Dodge St at 156th
NE 92: Bucktail (Arthur East)
US 275: Scribner
US 81: Hartington
I-80: I 80 at Mahoney Interchange
I-80: Giltner Exit
I-80: 108th St in Omaha
US 34: Arikaree River W of Haigler
I-80: Bushnell
I-80: Gibbon Exit
NE 7: Elsmere Rd
I-80: 60th St in Omaha
US 6: Oxford Intersection
NE 2: Hwy 2 at Syracuse
US 81: Hebron Scales
I-80: Melia Hill W of Omaha
US 20: Long Pine
I-80: 84th St in Omaha
NE 2: Bennet Corner
I-80: North of I in Omaha
I-80: I 80 at Beaver Crossing
I-480: Mo River Bridge
I-80: Gothenburg
I-80: I 80 at 84th St
US 385: S of Dalton
US 20: Nenzel
I-80: I 80 at 418
I-80: Gretna Exit 432
US 81: Hwy 81 Magnet
I-80: Lincoln Interchange
I-680: Omaha
I-480: Leavenworth St
NE 61: Arthur South
US 183: Miller
US 385: NE-SD Line N of Chadron
NE 91: E of Brewster
US 275: E of Pilger
I-80: Lexington Exit
I-680: Fort Street
I-80: I-680 interchange in Omaha
US 385: D5-385-99 South Aliance
I-80: Sidney West Exit
I-80: Big Blue
US 75: S of Dawson
US 75: Bellevue
I-80: Paxton Exit
I-80: Waco Exit
I-80: 3 Mi W of Kimball
I-80: I 80 at Utica Interchange
I-80: I80 at Sunol Exit 69
I-80: Seward Exit
I-80: I80 at Chappell
US 34: US 34 at Hwy 50
I-80: Kearney exit 275
I-80: Mahoney Park W of Omaha
I-80: York Overpass
US 77: Ceresco
US 83: Hwy 83 Medicine Creek
I-80: I80 at Brady exit
I-80: I 80 at Bluff Road
NE 15: Near David City
I-80: Exit 439
NE 1: Operations trailer 5
NE 1: Operations Trailer 2
NE 12: W of Norden
NE 2: Ne City River Bridge
NE 97: Dismal River S of Mullen
US 6: Axtell
US 75: Cornhusker Rd in Bellevue
NE 92: Tryon
I-80: Kimball East
US 81: So Yankton
US 81: W of Belvidere
NE 1: Operations Trailer 7
NE 61: N of Arthur
US 20: E of Royal
NE 71: Harrisburg
I-80: Odessa Exit
I-680: Maple Street
US 75: Childs Rd in Bellevue
I-80: Maxwell Exit
NE 14: Petersburg
US 75: L St. in Omaha
NE 1: Operations Trailer 8
NE 35: Emerson
I-80: Gretna Jct
US 83: SD border N of Valentine
US 77: Hwy 77 at Warlick
NE 71: W of Hemingford
I-80: Scale E of Lincoln
US 77: Van Dorn in Lincoln
I-80: I80 at Brownson exit 48
US 81: N of Columbus
I-80: Big Springs
NE 70: W of Arcadia
US 20: East Valentne
US 6: West Dodge at 118th
I-80: Phillips Exit
I-80: I 80 at Greenwood Interchane
NE 61: S of Merriman
NE 2: Hwy 2 at 75 South
I-680: N of Center at Shirley
NE 71: NE-SD Line
US 77:  Lincoln BNSF Railyard
NE 370:  N of Springfield
US 183: S Taylor
NE 21: Oconto South
I-80: Sidney Exit
I-80: Kimball
NE 45: Newman Grove
US 6: Dodge St at 204th St Underpass
I-80: Omaha 96th St
NE 15: E of Clarkson
NE 89: Near Wilsonville
I-180: BNSF Downtown Lincoln
NE 40: S of Arnold
NE 25: S of Wallace
I-80: 13th St in Omaha
I-80: 24th St in Omaha
I-180: Cornhusker Hwy
I-80: Pleasant Dale Exit
NE 14: Verdigre Spur S54A
NE 11: Hwy 11 East of Burwell
US 75: Omaha
NE 2: Hwy 2 NE City
US 77: Hwy 77 at Hwy 92 Wahoo
I-80: Kearney WB DMS
I-80: Hampton Exit
I-80: I80 at NW 24th
I-80: Hwy 75 in Omaha
I-80: Hershey Exit
US 75: Tekamah
NE 23: Venango
NE 1: Operations Trailer 6
US 136: E of Riverton
US 75: S of Winnebago
NE 87: S of Hay Springs
I-80: Giles Road Exit
US 20: Wood Lake
I-480: Martha St
US 275: W of Norfolk
NE 1: Operations Trailer 1
NE 50: Manley
I-80: I 80 at 422
I-80: Kearney Archway
US 20: Allen
US 20: Harrison
US 83: S of McCook
NE 87: S of Whiteclay
NE 97: Brownlee Rd S of Valentine
NE 14: S of Clay Center
NE 1: Operations Trailer 4
I-80: W of Kearney
I-80: Alda Exit
NE 11: W of Chambers
I-680: N of Pacific
NE 23: Eustis East
I-80: E of York WB Restarea
US 26: N of Bayard
US 6: W of Culbertson
US 77: Oakland
US 81: Madison
I-80: North Platte Exit 177
I-80: Kennedy Freeway
I-80: Cozad Exit
I-80: Overton Exit
I-80: Oshkosh Exit 95
US 136: W of Harbine
I-80: Lincoln Exit to 27th St.
I-80: US 77 South Exit in Lincoln
I-80: North Platte Exit to L56G
US 83: Brownlee Rd N of Thedford
US 183: Sargent/Comstock Rd
NE 12: Obert
US 275: Waterloo over NE-64
US 20: E of Harrison
I-80: Grand Island Exit 312
I-80: Grand Island EB DMS
I-80: Ogallala Exit
US 30: W of Rogers
NE 92: Arnold East
I-80: Bradshaw Exit
US 75: Gilmore Bridge in Omaha
US 26: Ash Hollow
US 26: Hwy 26 W of Scottsbluff
I-80: W of York
US 20: Gordon
I-80: Aurora WB DMS
US 83: Dismal River Bridge
US 81: Chester
I-80: Shelton Exit
I-80: Brule
US 26: Hwy 26 NE-WY Line
US 81: W of Randolph
I-80: Dix
US 6: Near Enders
US 281: E of Chambers
I-80: Sutherland Exit
NE 21: Cozad South
US 6: Dodge St at 168th
I-80: Lincoln Airport Exit
US 34: US 34 at US 75
NE 250: Smith Lake
I-80: I 80 at Goehner Interchange
I-680: West Dodge
Google Static Map Image
Camera Camera